Roadmap
One page for the work that moves your compliance programme forward — planned, owned and tracked across four levels, shown through six tabs.
The Roadmap is where compliance work lives. Everything on it sits in
one hierarchy: a Program holds Projects, a project
holds work packages (a bundle of related
tasks that belong together), and a work package holds
Work items (the individual tasks somebody actually does). One page,
headed Compliance Roadmap, carries the lot across six tabs —
Portfolio, Board, Kanban,
Gantt, Proposals and Action Items. Reach
it from the left menu under Governance → Roadmap,
or at /compliance/roadmap. This chapter walks the
Portfolio tab, because that is where objects are created, owned,
linked and changed; the other five are summarised further down.
Who uses it
Two layers decide what you can do here. Your Aegis role sets the outer limit,
and your
program access (the level a program grants
you: Program Administrator, Lead,
Contributor or Read-only) decides which actions each
row offers you within that limit.
-
Viewer — sees the
Roadmapmenu entry like every role and holds read permission on roadmap objects, so every tab opens read-only: the controls that create, edit, move or delete are absent. -
Contributor — the role in
the captured screen. Can create objects, edit them, assign owners, move them
under a different parent, manage governance links and run the AI actions —
each where their access to that program allows it. Cannot delete: the bin
icon is absent. In the captured screen the program row offers only the
Dashboard & membersandGovernance linksicons, because that user's access to the program does not include changing its structure. - Manager and Admin — all of the above, plus deleting programs, projects, work packages and work items on programs where their access lets them manage the structure.
What's on this screen
Reading the captured screen from the top down:
-
The page heading Compliance Roadmap, then a row of six
tabs, the active one underlined — here
Portfolio. -
The heading Portfolio object explorer ("Browse and manage
every object in the roadmap hierarchy."), and under it a
toolbar: a three-way view switcher (
Table,Details,List), two AI buttons (Propose work packages with AI,Fill a work package with AI), a dropdown showingProgram(the level to create, labelledType to create) and aCreatebutton. -
A filter row of five pills —
All types,Program,Project,Work package,Work item— withAll typesselected, then anAssigned todropdown set toAnyone. -
A panel headed Change many objects at once ("Pick a type,
select the objects, then review and apply one change to all of them."), with
its own
Typedropdown (hereWork item), a0 selectedcounter, a greyed-outChange selectedbutton, aSELECT ALLrow and a scrollable list of tickable work items. In the captured screen these are the demo tenant's ISO 27001 tasks, such as "Document ISMS scope and boundaries" and "Enforce MFA for all Microsoft 365 accounts". -
The object table: columns
NAME,TYPE,OWNER,PARENT,LINKS,ACTIONS. The first row in the captured screen is the program "ISO 27001:2022 Certification", with a named owner,—underPARENT(programs sit at the top) and one governance link. The list continues below the fold with the projects, packages and items beneath it. An object with no owner showsUnassigned; one with no links shows—. -
Each row ends with action icons. Which appear depends on
the object's level and your access to its program: dashboard and members
(programs only), governance links, assign owner, move to another parent,
fill with AI (programs and projects only) and edit — plus delete for a
Manager or Admin. Below the table, out of shot, a note says that governance
links added here also appear in the Board's
Linkscolumn, and under it aWork packagessection creates, edits and deletes packages and moves work items in and out of them.
Find your way around the Portfolio tab
The numbered steps below match the numbered markers on the screenshot that follows.
-
Choose a tab.
Portfoliois the object explorer, and where the page opens on your first visit. Each tab you visit stays loaded, so switching back keeps its filters, expanded rows and selection — and its data is refreshed, so an edit made on another tab shows straight away. -
Pick a view.
Tableis the working view described here;Detailsgives one read-only row per object with status, priority, owner, deadline and a completion bar, andListdraws the tree as an indented outline. Neither changes anything, and your choice is remembered. -
Select
Propose work packages with AI. A dialog opens where you pick a target project and the governance sources to draw on; nothing is created until you review the proposal and apply it. -
To add something by hand, set the type dropdown to the level you want and
select
Create; that level's create dialog opens. The dropdown offers a level only once a parent for it exists that you may add to, so a fresh tenant starts withProgramalone. -
Narrow the table with the type pills. The
Assigned todropdown beside them lists only people who own at least one object, plusAnyoneto clear it. When nothing matches, a short message replaces the table. -
Use
Change many objects at oncewhen one edit applies to several objects. Tick the objects; the counter to the left of the button counts them, andChange selected— greyed out at0 selected— becomes available.
Create an object
-
Set the type dropdown to the level you want and select
Create. A dialog titledCreate Program,Create Project,Create Work packageorCreate Work itemopens. -
Enter a
Name. It is required —Savestays disabled until it has content. Add aDescriptionand, if you want one, aPriority; both are optional.Priorityis not offered when you add a work item to a program where you are a Contributor member: the item starts at Medium, and a Lead or Program Administrator sets its priority and dates. -
For anything below
Program, choose aParent— the program, project or package the new object belongs under. This is required too: saving without it reportsA parent is required.and nothing is created. The list offers only parents you may add to. -
Select
Save. The dialog closes, a confirmation readingCreated "…"appears, and the object joins the table — and the Board, Kanban and Gantt tabs, which read the same hierarchy. If the save is refused, the message says why: "You do not have permission to change this object." for an access problem, or the field the server rejected.
Owners, parents and governance links
The icons at the right of each row are the per-object actions, left to right. They are not a sequence — use whichever one the job needs.
-
The dashboard icon, labelled
Dashboard & membersand shown on program rows only, opens that program's dashboard — see the next section. - The links icon opens the governance-links panel. It lists the artefacts already linked — policies, procedures, framework controls, risks, vendors and evidence — and lets you add one by picking a register and searching it, or remove one. If your access to the program does not allow linking, the panel is read-only.
-
The assign owner icon opens a dialog with one
Ownerdropdown; leaving it blank unassigns the object. Save and theOWNERcolumn updates. - The move icon re-parents an object — a project under a different program, a work item into another package. It is greyed out when no candidate parent exists, and absent on programs. Moving is a structure change: you need the Lead or Program Administrator tier on the program the object leaves and on the one it lands in, so the icon is not shown otherwise.
-
The edit icon reopens the same form, titled
Edit …, with the object's name, description and priority loaded. The parent is not offered here — use the move icon for that. A Contributor member can edit work items; editing a program, project or package needs the Lead or Program Administrator tier. - Manager and Admin also see a delete icon, which asks for confirmation first.
Removing a program takes its projects, their work packages and their work items with it. The confirmation dialog says so before anything is written — "This also removes everything beneath it." The records are soft-deleted — kept in the database for the audit trail, but gone from every view and every count. If you only want the object out of the way, move its children to another parent first.
Program dashboard and members
-
On a program row, select the
Dashboard & membersicon. A large dialog opens, titled with the program's name followed by "dashboard & members". -
Read the dashboard. It shows
Overall completion, counts ofTotal items,OpenandDone, a breakdownBy statusandBy priority, theAt-risk items(blocked or overdue, or "Nothing at risk" when there are none) andSlippage— how many days the program runs behind its baseline. -
Use the
Open inlinks to jump to theTable,GanttorKanbanview, or to the program'sRACImatrix (who is responsible, accountable, consulted and informed). The RACI page is reached only from here. -
Under
Program access, see who can work on the program and at what level. The owner is listed asProgram Administrator (owner). A Program Administrator can grant access to another user, change a member's access level or revoke it; everyone else sees the list with the note "Only a Program Administrator can manage access."
Change many objects at once
-
Set the panel's
Typedropdown to the level you want. The list reloads with objects of that level and any earlier selection is cleared. Objects on programs you can only read are markedNo accessand cannot be ticked. -
Tick the objects, or use
SELECT ALL. The counter updates as you go and aClear selectionlink appears. -
Select
Change selected. Step 1,Choose values, listsAssignee,Status,Start date,DeadlineandPriority. Tick each attribute you want to change and give it a value; anything unticked is left alone.Statusis not offered for programs, and an attribute your program access does not let you change on one of the selected objects is left out, with a note saying so. -
Select
Next. Step 2,Review & apply, shows one row per changed attribute with its destination value and how many objects it will touch. -
Select
Apply. The changes are written together, a message reports how many objects were updated, and the selection clears.
The other tabs
| Tab | What it shows |
|---|---|
Board |
A sortable, filterable grid across the hierarchy, with inline
editing of status, priority and completion and drag-and-drop (or a
per-row Move to…
picker) to re-parent a row. Changing a priority or re-parenting
needs the Lead or Program Administrator tier on the program; a
Contributor member updates status and completion.
|
Kanban |
The objects of one chosen level as cards in five columns —
To do, Doing, Blocking,
Solved, Done. Drag a card, or use its
Move to… picker, to change its status; program cards
are not draggable, as they roll their status up. Filter by owner and
priority, group work items into sprints, and confirm a
Done item that awaits the accountable person's
confirmation.
|
Gantt |
A timeline. Each bar shows its planned span against a thinner baseline bar, with a red deadline marker and amber for the critical path. Drag a bar to reschedule, or draw a dependency between rows. |
Proposals |
Every work item that came from an AI implementation proposal saved anywhere in Aegis, each showing the object it came from. Empty until a proposal is saved on a source object such as a framework control or a risk. |
Action Items |
The follow-up actions raised from AI insights elsewhere, folded in from what used to be its own page — see Action items. |
The AI assist
-
Propose work packages with AI— pick a target project and any mix of governance sources (policies, procedures, baseline security standards, risk mitigations). Aegis proposes work packages with candidate work items; only the ones you accept are created. -
Fill a work package with AI— for one package, Aegis suggests which work items from other packages in the same program to move in, and which new ones to create. -
Fill with AIon a row — the same idea for a container: on a program it suggests projects to move in or create, on a project it suggests work packages. The icon is on program and project rows only, and only where you may manage that program's structure.
The two toolbar buttons appear only when you are allowed to run AI actions and have at least one program you can add work to; the tenant's AI features must also be switched on. Each proposal is a draft on screen. Nothing is written until you tick what you want and apply it, and closing the dialog leaves everything unchanged. AI assists; the organisation decides.
Tips and limits
-
The table view is the working view. The filters, the bulk
panel and the per-row actions appear in
Tableonly;DetailsandListare read-only. The two AI buttons and the create control stay in the toolbar in all three views, so it does not shift when you switch. In an empty tenant the only level you can create isProgram— the levels below it appear once a parent exists. -
Empty states are plain. With nothing recorded the table
shows "No roadmap objects yet."; filtering to a level with none shows "No
objects of this type yet."; filtering to a person with nothing at that level
shows "No objects assigned to this person for the selected type."; the bulk
panel shows "No objects of this type you can edit." If the objects cannot be
loaded, a message with a
Retrybutton appears instead. -
Tabs remember themselves. The page reopens on the tab you
last used, and a link carrying
?tab=overrides that — which is how theAction Itemsmenu entry lands you on its tab. Selecting a tab writes it back into the address, so a copied link opens on the same tab. -
Missing icons usually mean access. If a row offers fewer
actions than you expect, ask the program's Program Administrator to check
your access level in
Program access.
Where this connects
- Action items — now a tab on this page.
- Compliance frameworks and Risks — controls and mitigations you can link to roadmap work, and the origin of most AI proposals.
- Policies, Procedures, Security standards, Vendors and Evidence — the other proposal sources and link targets.
- Governance bodies — the boards that review whether this work is on track.